Sourcing and Audit of Industrial Rolled Metal Products Suppliers in China

Добавил этот блок

How do we find specialist metallurgical plants in China? We filter manufacturers through SAIC databases, customs declarations and industry registers. We exclude traders: we work only with factories that have their own rolling lines, export licences and ISO 9001 certificates. We verify product compliance with GB/T, DIN EN 10025 and GOST 14637 standards at the initial scoring stage.
How does our office in China carry out the on-site production audit? EV Group China engineers visit the site without prior notice to the supplier. We record actual workshop load, the availability of spectral analysers, the condition of warehouses and logistics hubs. We publish a photo and video report with geolocation, a technical condition report and a production capacity assessment within 3 working days.
What delivery parameters and minimum volumes do you provide? We operate on direct contracts with no intermediary chain. We draw up specifications to your technical requirements and calculate logistics taking into account customs payments and insurance.
Parameter Details
Minimum volume (MOQ) From 20 tonnes (sheet/rolled products), from 50 tonnes (pipes/rebar)
Delivery term FOB (Chinese port), CIF (port of destination), DDP (client’s warehouse)
Batch certification Factory quality certificates, test protocols to GB/T, GOST, DIN
Commercial proposal preparation time 24–48 hours after receipt of technical specifications
Standards

Cross-check against GOST, GB/T, DIN, ISO. Verification of heat certificates and chemical composition.

Volumes

We work with rolled metal products batches from 20 tonnes (MOQ). Smaller volumes are inspected on request.

Methods

Ultrasonic flaw detection, wall thickness measurement, geometry inspection, anti-corrosion coating control.

How is the process structured from application to shipment?

The process is transparent and clearly regulated. You have control at every stage with no hidden charges and no additional approvals.

01

We receive technical specifications, drawings and requirements for the chemical composition/mechanical properties of the metal

02

We carry out digital scoring of 5–7 factories and screen them by MOQ and standards.

03

We organise an on-site audit and agree commercial terms.

04

We monitor production and take samples at an accredited laboratory.

05

We organise customs clearance and delivery under the FOB/CIF/DDP basis.

How is the quality of rolled metal products controlled before dispatch? Inspection takes place before containers are sealed on factory premises. We verify marking, geometry, thickness, chemical composition and mechanical properties for compliance with declared GOST/GB standards. If deviations exceed 0.5%, we block shipment, require remelting of the batch or adjust the contract price in your favour.
You gain not just a supplier, but a reliable partner who will become the foundation of your success in China
[wpforms id="15"]

Send a request

Send a request