What goods do you help import into China?
We work with any equipment and consumer goods; core expertise is industrial rolled metal products (rebar, pipe, sheet, special profiles). We ensure product compliance with GB/T (China), GOST (EAEU), DIN (EU) standards. Minimum shipment volume for metal products: from 20 tonnes (MOQ).
| Standard | Region of application | Typical products |
| GB/T | China | Rolled metal products, equipment, consumer goods |
| GOST | EAEU / Russian Federation | Metal products, raw materials, pipes |
| DIN/EN | EU | Industrial equipment, special steels |
What documents are required for legal importation?
- Basic package: invoice, packing list, bill of lading, certificate of origin, declaration of conformity.
- Certification: assistance in obtaining mandatory CCC, CQC marks; processing of voluntary certificates to GB/T standards.
- Licensing: support in obtaining import licences for regulated categories (chemicals, metals, dual-use equipment).
What delivery terms do you offer (logistics bases)?
| Term | What is included | When it is advantageous |
| FOB (port of departure) | Delivery to port, export customs clearance | When you have your own freight forwarder |
| CIF (Chinese port | )Freight + insurance to Chinese port | For optimising logistics costs |
| DDP (recipient’s warehouse) | Full “door-to-door” service, payment of duties and taxes | For minimising the importer’s operational risks |
Cross-check against GOST, GB/T, DIN, ISO. Verification of heat certificates and chemical composition.
We work with rolled metal products batches from 20 tonnes (MOQ). Smaller volumes are inspected on request.
Ultrasonic flaw detection, wall thickness measurement, geometry inspection, anti-corrosion coating control.
How does the supplier audit and quality control work?
- Physical on-site audit: factory inspection carried out by our office in China (not remotely, not through subcontractors).
- Capacity verification: assessment of the production line, quality control (QC) system and warehouse logistics.
- Pre-shipment inspection: random sampling of the finished batch, photo/video documentation, report within 24 hours.
What are the lead times and minimum volumes?
- Rolled metal products: MOQ from 20 tonnes, shipment preparation lead time — 7–14 days.
- Equipment and consumer goods: terms are agreed individually at the technical specifications stage.
- Average turnkey import lead time: 14–25 days (depending on the delivery basis and type of certification).
How much does import support cost?
- Transparent structure: fixed agent commission + actual expenses (freight, duties, certification).
- Pricing factors: batch volume, chosen Incoterms, product category, complexity of certification procedures.
- Calculation: a preliminary estimate is provided within 24 hours of receiving the technical specifications.
Own office in China — direct operational control at all stages, with no subcontractors
Industry expertise — in-depth knowledge of specifications, standards and market prices in the rolled metal products segment
Comprehensive foreign trade outsourcing — from supplier sourcing and audit to logistics and customs clearance
Operating to international standards — contracts, Incoterms and documentation comply with the requirements of China and the EAEU