What is B2B product branding in China?
In brief: manufacturing products under your trade mark with a full quality control cycle. We do not create “attractive concepts” — we organise the physical application of logos, labels and packaging to industrial and consumer goods in compliance with contractual specifications.
We work with two categories:
- Industrial rolled metal products (rebar, pipe, sheet, section steel) — core expertise
- Consumer goods and equipment — on request, with the involvement of specialist contractors
What are the minimum order quantities (MOQ) and lead times?
| Parameter | Rolled metal products | Consumer goods / Equipment |
| MOQ | from 20 tonnes | from 500–1,000 pcs. (depending on category) |
| Production lead time | 15–30 days after technical specifications approval | 20–45 days |
| Logistics lead time | 25–40 days (sea), 7–14 days (rail | )same |
| Delivery terms | FOB / CIF / DDP — client’s choice | same |
For rolled metal products: orders from 50 tonnes receive priority placement on production lines and a 30-day price lock.
Cross-check against GOST, GB/T, DIN, ISO. Verification of heat certificates and chemical composition.
We work with rolled metal products batches from 20 tonnes (MOQ). Smaller volumes are inspected on request.
Ultrasonic flaw detection, wall thickness measurement, geometry inspection, anti-corrosion coating control
How is quality and standards compliance controlled?
We do not outsource quality control. Our office in China carries out:
- On-site factory audit prior to contract signing: verification of licences, production capacity and references.
- Pre-shipment inspection using a checklist: geometry, marking, packaging, compliance with drawings.
- Laboratory tests where required: mechanical properties, chemical composition, corrosion resistance.
GOST (Russian Federation, EAEU)
GB/T (China)
DIN / EN (EU)
Custom technical specifications — by agreement
- FOB (port of shipment in China) — you control the main logistics
- CIF (port of destination) — we cover freight and insurance
- DDP (to client’s warehouse) — full cycle: customs clearance, VAT, door-to-door delivery
- Cargo consolidation from multiple manufacturers
- Chestny Znak labelling, EAC, barcoding — compliant with marketplace requirements
- Cargo insurance at all stages
Target clients:
- Rolled metal products distributors launching private labels for regional networks
- Sellers on Wildberries, Ozon and AliExpress requiring unique packaging
- Industrial holdings localising component manufacturing in China
- Bloggers and influencers with their own merchandise or tool line
What you receive as an outcome:
A market-ready product bearing your brand
A complete documentation package for customs and marketplaces
A transparent chain: from the factory to your warehouse
A single point of contact — manager, lawyer and logistics specialist in one chat
How to get started? Step-by-step process
- Technical specifications and calculation — you send your requirements, we prepare a commercial proposal broken down by line items (production, logistics, customs).
- Contractor selection — we propose 2–3 verified factories with audit reports.
- Sample and contract — we approve the prototype, confirm specifications and sign the contract.
- Production + control — weekly reports, with the option for your representative to visit on-site.
- Shipment and support — documentation, tracking, after-sales support.