Where and how is the Chestny Znak label applied?
Labelling is carried out at our consolidation warehouse in China (automated labelling line) or directly at the supplier’s site. We use certified label printers and 2D scanners for code aggregation. Line throughput reaches 5,000 units per shift without disrupting the production rhythm.
Labelling at the warehouse or on-site at the manufacturing facility in China?
At the warehouse we use stationary equipment for flow batches with subsequent cargo consolidation. When visiting on-site, our engineers deploy portable systems on the packaging line, carry out a physical equipment audit and integrate the code into the cycle without stopping the conveyor.
How do we guarantee customs clearance and compliance with the Federal Tax Service?
We verify the compliance of packaging, accompanying documents and codes with GOST, GB/T and DIN standards prior to shipment. We generate DataMatrix codes through the official operator, verify each code and assemble the package for Russian customs. We eliminate the risks of cargo seizure and fines for incorrect labelling.
How do we guarantee customs clearance and compliance with the Federal Tax Service?
We verify the compliance of packaging, accompanying documents and codes with GOST, GB/T and DIN standards prior to shipment. We generate DataMatrix codes through the official operator, verify each code and assemble the package for Russian customs. We eliminate the risks of cargo seizure and fines for incorrect labelling.
Сверка с ГОСТ, GB/T, DIN, ISO. Проверка сертификатов на плавки и химический состав.
We work with rolled metal products batches from 20 tonnes (MOQ). Smaller volumes are inspected on request.
Ultrasonic flaw detection, wall thickness measurement, geometry inspection, anti-corrosion coating control.
The process is transparent and clearly regulated. You have control at every stage with no hidden charges and no additional approvals.
What volumes, lead times and logistics conditions do you handle?
We handle any volume, optimising routes to the chosen Incoterms. For specialist deliveries of industrial rolled metal products, MOQ is set at 20 tonnes, with simultaneous processing of certificates and preparation for labelling of related consumer goods. Lead times are tied to the logistics basis: FOB/CIF/DDP.
| Parameter | Value |
| Application point | EV Group warehouse in China / Supplier’s factory |
| Processing speed | 1–3 working days |
| Logistics bases | FOB, CIF, DDP (including customs clearance) |
| Standards control | GOST, GB/T, DIN + DataMatrix verification |
| Minimum order | From 1 pallet (consumer goods), from 20 tonnes (rolled metal products) |
On-site audit of production lines and the supplier's warehouse in China
Generation, verification and printing of DataMatrix codes to Federal Tax Service requirements
Label application at the consolidation warehouse or with a visit to the factory
Integration of labelling into the logistics cycle (FOB/CIF/DDP)
Consultations on certification and packaging adaptation to GOST/GB/T